Pile foundation of piers for ferry terminal Gazenica in Zadar

Zakladani staveb, Co., and its branch Zagreb were involved in currently the largest project of its kind in the Adriatic Riviera and the Mediterranean. It was a pile foundation of piers for the Croatian ferry port of Zadar. Marinas comprise four piers and several coastal harbors. Individual piers are based on two to fi ve rows of piles. On the piles was also founded a recirculation channel between a free sea and the pool of a fi shing port. In total, there were realized 359 pieces of piles diameter 1340 mm with extended heel to 1500 mm, embedded from 3,0 to 4,5 m in a healthy bedrock. Works from the water surface have been extremely diffi cult, production of piles was also subject to strčit tolerances: head height ± 5 cm, layout location of up to 10 cm in all directions from the ideal center.

Measures

Total number of piles: 359 pcs
Total length of piles: 6975 m
Average length of pile: 19,5 m (9,80–31,30 m)
Total weight of reinforcement steel (including permanent casing): 2197 t
Volume of cast concrete: 9855 m3

 

Client

Strabag, d. o. o., Zagreb, Croatia

Investor

Lučka uprava Zadar

Price

Year

3 314 405 EUR incl. VAT 2011-2012



  • Searching for references
  • Supporting technologies : Piles

Basic data
Administrative address

Zakládání staveb, a. s.,
Dobronická č.p. 1371
148 26 Praha 4

 

E-mail general: info@zakladani.cz
E-mail for offers: zakazka@zakladani.cz
Data box - ID: 44utdij

GDPR Privacy Policy
Company logotype

Reception desk

Zakládání staveb, a. s.
K Jezu 1, P. S. 21
143 01 Praha 4 - Modřany

ID Number: 49241567
Tax ID Number: CZ49241567

Company registered in the Commercial Register at the Municipal Court in Prague, Section B, Insert 2139.

mapa pasiv1

class="site view- no-layout no-task ">