The port of Mělník, 1st pool – new protection wall of the container terminal - Zakládání staveb, a. s.

The port of Mělník, 1st pool – new protection wall of the container terminal


The port of Mělník, 1st pool – new protection wall of the container terminal
The purpose of a newly built angular bank wall is to protect vessels up to the level of the 2002 floods. There is also another aim of improving the conditions for using the Elbe waterway to transport containers that are brought to the port on water and then further distributed by freight transport. The new bank wall was carried out as an extension of the existing wall. Its length reaches 254 m and it was made of 12,5 m long sheet piles IIIn anchored with permanent anchors from a work platform made inside the port pool. The existing wall was additionally anchored with permanent anchors from the Jadran vessel.

Measures

Rammed sheet pile wall made of sheet piles IIIn: 3250 m2
Permanent 9-strand anchors: 2342 m
Permanent 6-strand anchors: 652 m
Earth works: 17 000 m3

Client

VIAMONT DSP Co., Železničářská 1385/29, Ústí nad Labem

Investor

Directorate of Waterways CR, Soběslavova 44, Praha 3

 

Price

Year

1,35 mil. EUR 2006-2007



  • Searching for references
  • Type of construction : Hydrotechnical projects
  • Country : Czech Republic
  • Financial volume : 10–50 mil. Kč
  • Completion date : 2006-2010
  • Supporting technologies : Anchors,Driving

Basic data
Administrative address

Zakládání staveb, a. s.,
Dobronická č.p. 1371
148 26 Praha 4

 

E-mail general: info@zakladani.cz
E-mail for offers: zakazka@zakladani.cz
Data box - ID: 44utdij

GDPR Privacy Policy
Company logotype

Reception desk

Zakládání staveb, a. s.
K Jezu 1, P. S. 21
143 01 Praha 4 - Modřany

ID Number: 49241567
Tax ID Number: CZ49241567

Company registered in the Commercial Register at the Municipal Court in Prague, Section B, Insert 2139.

mapa pasiv1